-
CUSTOMER:BBL Construction
-
END USER:Plug Power
-
DURATION:9 Months
SMART Electrical Solutions
Martin Electric was contracted by BBL Construction Services, LLC., to design and construct Plug Power’s electrical system for their new 350,000 SQFT world-class, hydrogen fuel cell manufacturing facility in Slingerlands, NY. The primary goal was to provide 200,000 sqft of manufacturing space and 150,000 sqft of research & development office space that is designed with power redundancy to operate 24/7 without fail.
Services Provided:
Pre-Construction Services, Temp Power& Lighting, Production Distribution, Access Control System, 30,000 sqft of class I DIV I testing rooms, N-Light Control System, Emergency Power, Etc




